fairy mountain - oriental switzerland, the first pastoral plain in the south
october 22, 2020
the stadium and its supporting facilities cover an area of 173,333 square meters (about 260 acres), with a project investment of 105 million yuan. the main body of the stadium is a reinforced concrete frame structure and partial steel structure, which is configured in an oval shape. the grandstand construction area is 8082 square meters, and the main body perimeter is 700 meters. there are large parking lots and vip parking lots built off-site.
the top stand has four large evacuation channels, with a seating design standard of 11,000. it has an artificial anti-corrosion wooden chair body and is equipped with two large electronic display screens and four high-pole floodlights. the entire stand is covered with plastic surfaces. the rostrum canopy is a steel structure, and the lower floor of the stand has a construction area of 13,748 square meters. it is equipped with a reception room, conference room, athlete training hall, lounge, locker room, table tennis room, equipment storage room, star-rated public toilets, etc.
the sports field has a total area of 25,000 square meters, including a standard football field (artificial turf), a standard plastic track and field track (400 meters) and an event service area.
the construction of the stadium provides venue services for large-scale events, tourism gatherings, large-scale performances, etc., and also enriches the spare time life of the local people.
|
address: no. 1, xiangye road, fairy mountain street, wulong district, chongqing
copyright © fairy mountain national tourism resort 2020 all rights reserved chongqing icp no. 20006315-1
technical support: chongqing dingwang technology
official account qr code
douyin qr code